Developing the Procedures of No Contact Geodetic Measurements for High Building's Facades with Complicated Separate.

Document Type : Research Studies

Author

Public Works Department, faculty of Engineering .,El-Mansoura University., Mansoura., Egypt.

Abstract

In this paper was developed a methodology and executive surveys of the position, component and operational monitoring of façade constructions, This methodology is available for separately façade elements with different and complicated geometric shapes. 
Procedures and interpretation of the results of measurements with the appropriate theoretical substantiation of the proposed solutions are developed in this thesis, resection method used for determining the coordinates in the most probable plan and intersection method used for the coordinates of the separate element points. : The results of the geodetic measurements were processed. The coordinates of the separate elements of the façade were calculate the position and the deviation of the most probable plane of real facade. This methodology is very suitable for setting the facades of the high-rise building. 

Keywords

Main Subjects